**JOB HIGHLIGHTS***Work based at Tanjung Bin Johor.*Enthusiastic team.*Career advancement.**ROLES & RESPONSIBILITIES***Read and understanding in detail Scope of Work, Specifications, Design Basic and project schedule milestones.*Planning And Organization Of Some Non-Capital E&I Project Work, Including Plant Shutdowns.*Read and understanding in detail layout drawings, SLD & schematic drawing, instrument P&ID & loop drawings, vendor drawings and typical installation drawings etc.*Lead The Installation, Repair, Test & Calibration Of Electronic And Pneumatic Instruments, System And Analyzers.*Read The Itp ( Inspection And Test Plan ) Of Each Activity And Make Sure Construction Quality Is Met For Each Activity.*Lead The Trouble Shooting In Various Instruments Field Instruments (Transmitters, I/ P Transcedures And Leveltrols).*Lead And Perform The Loop Checks (Cold/ Hot Loop) Within The Required Quality Levels.*Lead And Perfrom The Pre-Commissioning Tests And Solve Problems On Instrumentations.*Attend the project safety site walks and actively involve in safety improments.*Check and take out the MTO for additional works, update to project engineer and do feedback status of VO (additional) to project engineer.*Plan the materials requirement and coordinate with procurement team for project procurement engineer.*Check the daily PTW system and make sure all activities shall be covered by PTW system.*Check the assigned activities at site and make sure works shall ongoing well with quality and safety & On-time.*Check and monitor the FS (Field Change Sheet/ Design Change) drawings and update to Project Engineer for additional claims without any delay.*Plan and prepare minimum One month in advance Manpower, Material, Machinery as per given task.*Prepare min 3 days in advance DWI to delegate work daily to individual crew.*Work Progress Update And Mitigation Plan Discussing In Daily Toolbox Meetings and Weekly Meetings.*Monitor and Daily update for work status to Field Engineer.*Managing co-ordination of the subcontractors engaged in project at field side.*Supervision of equipment installation.*Supervision of Civil works & Cable laying works in underground and above ground. Check coordination with other discipline.*To handle Field Equipment installation works in live plant and green area.*Check the integrety construction equipments and vehicles all the items and arrange the service as require.*Manage and monitor the foreman and workers for right attitide, behaviour and manner working at sites.*Update (feedback) to CM and PM for the site construction details regularly.*Upgrade to own self and attend the relevant industry training continuously to upgrade to meet the market requirement and have the competency.*Continuously monitor and identify the potential workers from workforce, coaching with leadership skills and update to HQ and arrangements to next levels.*Read And Understand The Testing And Commissioning Procedures For Substation Equipment, HV/MV Cables And Electrical Systems.**Job Type**: Contract**Benefits**:- Health insurance- Opportunities for promotion- Professional developmentSchedule:- Day shift- Monday to Friday- Weekend jobsApplication Question(s):- How many years of experience do you have as Electrical & Instrument Supervisor ?- How many years of experience do you have in Oil & Gas Industry ?- How many years of experience do you have in Construction field ?- Do you have valid OGSP & CIDB ?- Are you willing to travel to Tanjung Bin Johor ?**Education**:- Bachelor's (preferred)**Experience**:- Electrical & Instrument Supervisor: 3 years (preferred)- Oil & Gas: 3 years (preferred)- Construction: 3 years (preferred)